Enter your Proctor test points (moisture content vs dry unit weight). A parabola is fitted through them to locate the optimum.
Moisture content (%)
Dry unit weight (kN/m3)
–
Optimum moisture content (%)
–
Maximum dry unit weight (kN/m3)
–
Field target density (kN/m3)
Proctor Compaction Curve Result
Generated by calculatgeek.com Proctor Compaction Calculator
The Proctor test defines the moisture-density curve for a soil: dry density peaks at the optimum moisture content, and no physical point can plot above the zero air voids line.
Every embankment, road base, and structural fill on earth is built to a specification that traces back to a 1933 insight by Ralph Proctor, an engineer on Los Angeles dam projects: for a given compaction effort, every soil has one moisture content at which it packs densest. Too dry, and friction between particles resists rearrangement. Too wet, and the water itself occupies space the solids should fill. In between sits the optimum moisture content, and the density achieved there, the maximum dry density, becomes the yardstick every field density test is measured against.
From test points to the curve
The lab test compacts the same soil at four to six moisture contents with standardized effort (the 5.5 lb hammer of the standard Proctor, or the 10 lb hammer of the modified version used for heavier pavements) and reports a dry unit weight for each. This calculator fits a parabola through your points by least squares and reads off the peak: OMC where the derivative vanishes, MDD at that moisture. It also draws the zero air voids line, the theoretical density at full saturation for your specific gravity, computed as Gs x 9.81 / (1 + w x Gs). No real measurement can plot above that line, which makes it the built-in error detector of compaction testing: a point over the ZAV means a booking mistake, a bad volume, or a wrong Gs, not a miracle soil.
Worked example
Five points from 10 to 18 percent moisture, densities rising from 17.8 to 19.1 then falling to 18.2 kN/m3
The fitted parabola peaks at OMC = 14.4 percent, MDD = 19.06 kN/m3
The ZAV line at that moisture (Gs 2.70) sits at 19.07 kN/m3, safely above the peak
A 95 percent relative compaction spec translates to a field target of 18.11 kN/m3
Reading it like an earthworks inspector
The percent-of-MDD framing is what makes the curve operational: a nuclear gauge or sand cone test in the field produces a dry density, dividing by MDD gives relative compaction, and the spec (commonly 90 to 95 percent, higher under pavements and footings) says pass or fail on the spot. Moisture matters as much as the number, though. Compacting dry of optimum leaves a soil that looks dense but can collapse on first wetting; compacting wet of optimum produces lower strength and, in clays, a dispersed fabric with its own long-term behavior differences, which is why specs typically bracket moisture to within about two percent of OMC rather than chasing density alone. Two housekeeping cautions complete the picture: standard and modified Proctor give meaningfully different MDD and OMC for the same soil, so a field test judged against the wrong reference curve is meaningless, and a borrow pit is rarely uniform, so any visible change in material triggers a new lab curve rather than stretching the old one.