Raise the cutoff and a deposit shrinks but sweetens: the grade tonnage curve is that tradeoff drawn for every possible cutoff at once.

The equation

metal = tonnes × grade
  • Tonnes above cutoff fall as cutoff rises
  • Average grade above cutoff rises with cutoff
  • Contained metal always falls as cutoff climbs

Worked example

A deposit holding 5 million tonnes at an average 1.4 grams per tonne contains 7 tonnes of gold. Push the cutoff up and you might report 3 million tonnes at 1.9, richer ore but only 5.7 tonnes of metal: the rest just moved to the waste dump.

When to use it

The curve is the negotiating table between geology and the mill. Selectivity assumptions hide inside it: a curve built from big blocks smooths away high grade that small scale mining could capture, and vice versa.