Primary Consolidation Settlement Equation
Clays settle slowly as load squeezes water from their pores, and the consolidation equation predicts how much a layer will compress.
The equation
s = H (Cc / (1 + e0)) log((σ´0 + Δσ) / σ´0)
- H is layer thickness, e0 the initial void ratio
- Cc is the compression index from an oedometer test
- σ´0 is initial effective stress, Δσ the added stress
Worked example
A 4 meter clay layer with Cc of 0.25 and e0 of 0.9, initially at 80 kilopascals and loaded by a further 60, settles about 128 millimeters. The log term means the same load hurts less under a soil that is already heavily stressed.
When to use it
This is primary consolidation only: add immediate settlement before it and creep after it. If the clay is overconsolidated, use the recompression index up to the preconsolidation pressure and Cc beyond.
Related Calculators and Reference
- USCS Soil Classification Tool: classify soils from lab results.
- Slope Stability Risk Calculator: run stability with uncertainty included.
- ISSMGE: the international society for soil mechanics.
